Procedure and verdict
Picks the procedure by date and value, and checks aggregation, rotation, EU threshold, lots and bond. It closes with a single verdict.
For people who prepare public procurement in a Portuguese municipality, institute, school or public company. Say what you are buying and for how much; the simulator returns the admissible procedure, the calendar up to signature, the ranking of bids and the documents in PDF or Word. Every answer opens the text of the article in the Portuguese Public Contracts Code (Código dos Contratos Públicos).
No sign-up, no server, no cookies. What you type stays in your browser.
How it works
Five steps. Each returns a result you can check, with the article beside it.
Picks the procedure by date and value, and checks aggregation, rotation, EU threshold, lots and bond. It closes with a single verdict.
Compares the estimated value with real contracts in the same CPV class and region, and shows how many procedures received a single bid.
Calendar from invitation to signature, with national and municipal holidays, days off and the urgent tender counted in hours.
Ranks the bids and shows from which weight the winner changes. Generates the decision to contract, invitation, qualification checklist and art. 1.º-C record.
A worked case
It is the simulator's first example. These are the results it returns, step by step.
A public tender would only be mandatory from 130,000 €. art. 20.º/1 c)
Half between 11,220 € and 96,734 €. The 95,000 € sits at the top, which should be justified. art. 17.º/7
Against 41 % nationally. Three invitations are enough, but more help to get comparable bids.
The supplier can still be invited: current year plus the two previous ones. art. 113.º/2
If price weighed 20 % or less, bid B would win. The weights decide and need solid reasoning. art. 74.º
Award about three weeks after the invitation, in working days and with holidays. art. 470.º
Decision to contract, invitation, qualification and record, with the market reference in the reasoning. art. 1.º-C
The essentials before you start. If you meet a term you do not know, the glossary explains it with the article.
Open the glossaryNo. It applies rules of the Code to a specific case and shows the article behind each answer, so the decision-maker can check it. The decision and its reasoning remain with the competent body. art. 1.º-C/2 d)
From the consolidated text of the Code published by IMPIC, the Portuguese public procurement regulator, after DL 177/2026, reviewed article by article on 19 November 2026. Every citation opens the article text and the page of the official PDF. The legally binding text is the one in the Diário da República.
Yes. Enter the date of the decision to contract: before 1 October the previous thresholds apply, and the simulator switches regime automatically. DL 177/2026, art. 10.º
Simplified direct award, direct award, prior consultation, special prior consultation, public tender with and without an EU notice, and urgent public tender.
No. The page has no server or cookies; it only counts visits in aggregate, without identifying visitors or reading what you type. Everything stays in your browser's storage and can be deleted from the simulator footer. The BASE export you import is read in the browser itself.
From contracts registered on the BASE portal and published by IMPIC on dados.gov.pt: 681,579 contracts from 2024 to 2026, by CPV class and region. They are total contract prices, not unit prices, and help justify the estimated value with market prices. art. 17.º/7
Export your authority's contracts from the BASE portal as CSV and import it in step 1. The simulator adds up, per supplier, what was awarded by direct award and prior consultation in the current year and the two previous ones, and compares it with the limit of the procedure you will use. art. 113.º/2
They are drafts already filled in with your case: decision to contract, invitation or programme, qualification checklist and art. 1.º-C record, in PDF or Word. Review them and fill in the blanks before signing.
It applies the regional VAT rate to the commitment. The regional adaptations of the Code are not included; check them separately.
Start from one of the examples or enter your own. It takes two minutes and nothing leaves your browser.